History

1981 Bauer Egypt's establishment as a joint stock company between BAUER Spezialtiefbau GmbH and several Egyptian shareholders.
Bauer Egypt's first piling contract: BAHER TOWER.
The introduction and implementation of the Bauer System post Grouted Bored Piles.
The introduction and implementation of the post grouted ground anchors as a reaction system for compression pile load tests.
1985 Bauer Egypt's increase in market share and resources reaches about 200 %.
Bauer Egypt's first major project: piling works for The Agha Khan Towers at a value of approximately five million Egyptian Pounds.
1990 Bauer Egypt's first off shore piling contract: Mansoura Bridge.
1994 Bauer Egypt's purchase of its first state of the art Trench Cutter the BC 15.
Bauer Egypt's first Diaphragm Wall project: Shafts for the Waste Water Project in Alexandria.
1995 Bauer Egypt's purchase of the state of the art Jet Grouting equipment.
Bauer Egypt's first Tanking System project: Safir Hotel Extension, comprising of a laterally supported Diaphragm integrated with a horizontal Jet Grouting Blanket at its toe.
1997

Bauer Egypt's equipment fleet is enforced with two additional piling rigs and the advanced BC 30 Trench Cutter.
The development and installation of Post grouted Ground Anchors under static water head.
1998
Bauer Egypt's purchase of the state of the art Permeation Grouting equipment for Grout Blankets using soft gel.
1999 Bauer Egypt's equipment fleet is further increased with the purchase of two advanced piling rigs: the BG 15 and the BG 40.