Location:
Cairo
Client:
National Authority for Tunnels
Main contractor:
Egyptian French joint venture for Cairo metro line 3
Construction period:
2015 - 2016
Project description:
This phase of Cairo metro line 3 phase 4 consist of four stations (Heliopolis – Alf Maskan – Shams Club El Nozha), (4) Annexes, a cut & cover and an exit shaft.
Scope of Works:
• 72,800 m2 of diaphragm wall
• 105 Barrette with steel posts
• Soil treatment by using horizontal grout blanket for 3 stations
• Jet grouting & TAM for hard points
BAUER EGYPT S.A.E.
Specialised Foundation Contractors
197, 26 July Street
El Mohandeseen
Cairo
Phone: +20(2)33026083
Fax: +20(2)33023805
E-Mail: baueregypt@baueregypt.com
© by BAUER Aktiengesellschaft. All rights reserved.